Productivity

The application of the technology opens up certain prospects for economic benefits. Its design and operation, implies particularly low costs for power production and transmission to the grid. The productivity of the device depends on the size of the float. Here are some examples:  

      Dimensions              Size in m3     Forces on float half emerged

1.50 m   x  1.50 m    =    2.65  m3                 1.325 Kg 
1.75 m   x  2.50 m    =    5,95  m3                 2.970 Kg
2.00 m   x  2.50 m    =    7,85  m3                 3.925 Kg
2.00 m   x  3.00 m    =    9,42  m3                 4.710 Kg
3.00 m   x  3.00 m    =  21,20  m3               10.590 Kg
3.00 m   x  4.00 m    =  28,26  m3               14.130 Kg

IMPORTANT
The forces of the waves shown above, is expected to increase as much as twice, due to wave reflection on the vertical breakwater wall.